Subcontractor Defense

When the GC or owner moves against the subcontract

The defense starts with what the executed subcontract and the signed record say. Each position is built from documents, with the response package delivered for the client to review and issue.

Backcharge contests

Scope analysis of whether the charged work, such as rebar scanning and core drilling, falls inside the subcontract, with response variants for the client to send.

Notice to cure response

The cure period deadline is calculated from the contract. The response package is assembled from the correspondence and the project documents both parties signed, with an exhibit index. The client reviews the package and writes its own response. Unbranded draft correspondence for the client's letterhead is available on request.

Warranty and post-completion claims

Defense records built around the warranty expiration date, intervening causes, and the system's operating history. Change order denial letters and protective redlines are drafted, and the existing condition is flagged for preservation before remediation crews mobilize.

Owner-directed equipment and design

Failures in equipment the owner specified or directed, analyzed against who selected the equipment, who carried the design responsibility, and what the subcontract says about each, with payment structured under a reservation of rights.

Public work participation

Disadvantaged business participation on public work: the protections the program gives a certified subcontractor, analyzed alongside the cure period calculation.

Subcontract redlines

Subcontracts reviewed before signing, with risk-shifting edits returned as tracked changes.

The exhibit nobody has

From the record

A subcontract listed an electrical scope delineation drawing, by date, as a subcontract document. When the field asked whether the electrical room lighting and power rough-in was theirs, nobody at the subcontractor had the drawing. The GC said it was in the contract and asked the crew to start. The subcontractor had a written scope position built from the executed subcontract, a written request for the exhibit, and time and materials tracked from the first day.