An owner's representative reissued the submission instructions mid-stream and disregarded everything previously submitted. The documented return reasons concerned submission quality, not a determination of entitlement: unreadable pink slips, hours that differed between cover sheet and crew report, missing signatures and dates, cropped scans, and equipment ID numbers on the wrong request.
Construction management and claims consulting
Subcontractor claims and defense, built from the project record.
The Siewell Group supports subcontractors on data center and industrial projects with claims preparation, defense against backcharges and notices to cure, schedule and delay analysis, and document control from project award.
Revised schedule, 1 notice
A milestone moved left 79 days. Pricing was due in 6.
- Requests for equitable adjustment
- Backcharge contests
- Notice to cure response
- Acceleration claims
- Time impact analysis
- Primavera P6
- Deposition support
- Timecard audits
- Warranty claim defense
- Subcontract redlines
- Document control from award
What we do
Where subcontractors call us
Claims Support
Requests for equitable adjustment, acceleration claims, change order pricing review, and support to counsel in arbitration and depositions.
Claims SupportSubcontractor Defense
Backcharge contests, notice to cure response packages, warranty and post-completion claims, and owner-directed equipment disputes.
Subcontractor DefenseSchedule and Delay
Primavera P6 schedule review, version comparison, time impact analysis, and delay and impact quantification.
Schedule and DelayDocument Control and Portal
A document control retainer from award, with the project record kept in the client portal at siewellportal.com.
Document Control and PortalRetained at award
Subcontractors retain The Siewell Group early in the project as the document control collection point. When a notice to cure, a change order dispute, or a cost, delay, or acceleration disagreement comes up, it is addressed against an organized project record, with gaps and notice requirements flagged early.
From the record
Situations from current client work
A GC asked an electrical subcontractor to price pulling third-party acceptance testing forward 2 weeks. The testing was never in the subcontractor's scope. 2 replies were drafted for the subcontractor's letterhead: the testing is outside scope, and a signed change order comes before any acceleration cost.
2 weeks after a change proposal went in, the GC asked 1 question. The subcontract flowed down specifications requiring an updated schedule with every change quotation and a time impact analysis with every proposed modification. The sections went to the client's managers that evening, with citations.
Clients, owners, general contractors, projects, people, and dollar figures are not named.